RB Technologies is involved for more than 15 years in the field of energy management and more precisely combustion instrumentation. A key factor to conduct energy management program is to monitor actual consumption.
Obviously, the starting point is to acquire measures. Our core business is Measurement or Instrumentation which allow acquiring measurement data. However, Measuring is not a goal but a mean to reach the ultimate goal: Improving performance.
RB Technologies doesn’t run formally the Six Sigma methodology in its day-to-day business. However, we apply the DMAIC sequence when we conduct an audit/expertise at customer’s site.
|
In its report on Energy Efficiency and Renewable Energy Industrial Technologies Program: Energy Metering and Controls, the USA Department of Energy said:

"If you can't measure it, you can't manage it!"
|
|
|
|
|
|
|
|
Right from the start, we gather « the Voice of the Customer » to set up a precise set of specifications. Our team will conduct a coherent methodology to propose solutions on a step by step basis. |
|
 |
|
|
 |

All results in % mass
| Spectre |
En stats |
O |
Si
|
S
|
Cr
|
Fe
|
Ni
|
Total
|
| |
|
|
|
|
|
|
|
|
|
Spectre 1
|
Oui
|
57.60
|
|
19.02
|
4.88
|
18.50
|
|
100.00
|
| |
Oui |
57.64
|
|
19.47
|
5.80
|
15.81
|
1.28
|
100.00
|
| |
Oui |
55.31
|
0.77
|
19.98
|
9.64
|
11.68
|
2.62
|
100.00
|
| |
Oui |
52.30
|
0.55
|
20.54
|
7.45
|
16.47
|
2.69
|
100.00
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
Max.
|
|
57.64
|
0.77
|
20.54
|
19.02
|
18.50
|
2.69
|
|
|
Min.
|
|
52.30
|
0.55
|
19.02
|
4.88
|
11.68
|
1.28
|
|
Based on its experience, RB Technologies conduct on site expertise to identify the root cause of measuring devices malfunction or any combustion issue.
The probes are located in harsh environment due to high temperature and various chemical components exposure.
RB Technologies brought its 15 years of experience to develop a methodology which will break down the different parts of the process. It involves various universities and labs to conduct all kind of analysis such as:
- Scanning Electron Microscope
- Infra Red Spectrum
- Optical Microscope
For instance, we notice in numerous examples presence of oil and tar. These components obviously create a disturbance for the measurement.
RB Technologies developed several designs to address each and every situation. Based on the physical measurement that we perform in our labs, we build a set of recommendation to modify the design.
The outcome of our methodology is a full blown report which will allow you to further understand what is happening in the measuring devices surroundings.
We will bring our full support to implement measuring devices which will suit your process. We will start by a flue gas stream analysis. It will trigger the instrumentation scheme. We are eager to design Lean processes. We will stick to the “just necessary”. We will work with your engineering team to optimize your Return On Investment and create a sequence of investment rather than everything up front.
RB Technologies provide detailed engineering for all kind of heating equipment (boilers, ovens,)
- Define the root cause (capacity issue, built-up, vibrations, tubing issues, burner efficiency, control loop stability …) Design drawings/engineering drawings
- Run Thermodynamics calculation
- Run Energy Efficiency measurements and calculations
- Address environmental issues
RB Technologies has Project Management capabilities to implement its prescription :
Bid Packages prep work to procure equipment or sub-contracting
Project Management to guarantee Budget/Schedule/Quality
Control
Control system with standard PID control loop or more advanced features such as predictive control loop
O Control
Some plants still run pneumatic control system. Therefore, we often encounter high oxygen set point. We will drastically improve performance with an O pneumatic control system.
O+CO Control
When the combustion is short of air, unburned gas follows an exponential curve. However, there is a small portion which is almost linear that we can use for closed-loop control purposes. COe control allows running almost on a permanent basis under the optimum operating window.
Predictive control
Today, most of the control loops are PIDs. Coe control is very tricky and requires and won’t work with a classic PID. Predictive control is a way out has it will encompass all features required to undertake all process variations.

Our philosophy is to recommend and install the Juste necessary. We work in collaboration with our customers to maximize their return on investment and séquencer the expenditure in time.
* DMAIC stands for Define, Measure, Analyze, Improve, and Control
|
 |
|
|
|
 |
Upon your request, we can perform on site installation.
We can also perform calibration services and double-check that the apparatus is running under standard operating conditions.
Together with installation and calibration, we commission all equipment on site.
In the same way, following the installation and the calibration, we ensure the startup on site.
When the apparatus is part of your core process, we offer a 24/7 support to support production around the clock.
We propose a program user' s club which guarantees the provision of a stock of spare parts. This program is very appreciated as well by its comfort of use as by the profit of treasury.
|
 |
|
|
|
|
|
You need to improve your performance on a permanent basis. However, you are under high investment constraints. Retrofit is the best solution to find a way out. |
|
|
|
|
 |
|
• Locate measuring devices on the process
• Assess existing solutions (actual value, efficiency)
|
• New equipment on existing shell
• Obsolete components replacement
• Standardization
|
• Embed new process requirements
• Performance enhancement
|
|
 |
|
RB Technologies acquired competencies in thermal engineering to enhance boiler performance. For example, in a fuel change which is typically a shift from heavy oil to natural gas, RB Technologies managed the complete project for its Egyptian customer who runs boilers from 0 to 40 tons per hour of steam. Par exemple dans le cadre d’une évolution du combustible liquide à gaz (typiquement passage d’un fioul lourd au gaz naturel), RB Technologies a pris en charge l’ensemble de la prestation pour son client égyptien qui dispose de chaudières de 0 à 40 tonnes/hr de vapeur. It encompasses the full engineering scope. We run thermal calculations based on the actual design and process parameters. Then, we procure all equipment. The supply covers the full BMS (Burner Management System). Last but not least, we provide the complete control system which will obviously include air control. In such a project RB Technologies covers the full blown scope which does from DESIGN, ENGINEERING, PROCUREMENT, INSTALLATION, COMMISSION and START-UP. This scope complete or partial based on customer needs. |
|
|
|
|
|
|
|